Skip to content
Extra Form
Abstract This study presents the ways and means of the detailed design, and construction on the on-going 2,000,000BBLS FPSO (Floating, Production, Storage, and Off-Ioading Unit) installed in the AKPO field ('AKPO FPSO'), offshore Nigeria with a close outlook over the offshore market, especially in deepwater developments. First, we explain the overall process of the AKPO FPSO hull from the detailed design to the construction and contents of lesson-Iearn gotten from this FPSO hull in order to contribute the successful detailed design and construction of the future FPSO hull. Then, we describe some problems and their solutions during the detailed design and construction of the AKPO FPSO hull. Through this study, readers will roughly learn the detailed design and construction ofa FPSO hull.
Publication Date 2007-04-03

John-Kyu Hwang, Myung-Il Roh, Ji-Hyun Hwang and Ju-Hwan Cha, Kyu-Yeul Lee, "Overview on Detailed Design and Construction of 2,000,000BBLS FPSO", Proceedings of Design & Construction of FPU(Floating Production Units) 2007, Suntec, Singapore, pp. 1-6, 2007.04.03


  1. Ki-Su Kim, Myung-Il Roh, "Optimization of the Arrangement Design of a Ship Considering the Multiple Performance", Proceedings of ACSMO 2020, Seoul, Korea, pp. 167, 2020.11.23-25

  2. Ki-Su Kim, Myung-Il Roh, "Optimal Arrangement Method of a Ship Considering the Performance against Flooding", Proceedings of PRADS 2019, Yokohama, Japan, 2019.09.22-26

  3. Ki-Su Kim, Jung-Woo Hong, Sol Ha, Seung-Ho Ham, Nam-Kug Ku, Myung-Il Roh, "A Method for Optimal Arrangement Design Based on Expert System and Its Application to Submarine Design", Proceedings of IMDC 2015, Tokyo, Japan, 2015.5.11-14

  4. Ju-Sung Kim, Myung-Il Roh, Seung-Ho Ham, Ki-Su Kim, "Dynamic Method for Flooding Simulation of a Damaged Floater Considering Ocean Environmental Loads", Proceedings of the 30th Asian-Pacific TEAM 2016, Mokpo, Korea, 2016.10.10-13

  5. Ju-Hwan Cha, Seung-Ho Ham, Kyu-Yeul Lee, Myung-Il Roh, Kwang-Pil Park, Heung-Won Suh, "Discrete Event/Discrete Time Simulation of Block Erection by a Floating Crane based on Multibody System Dynamics", Proceedings of ISOPE 2009, Osaka, Japan

  6. Ju-Hwan Cha, Myung-Il Roh, Seung-Ho Ham, Kyu-Yeul Lee, Kwang Phil Park, Heung Won Suh, "Development of an Integrated Simulation Framework and Its Application to Shipbuilding Process Planning", Proceedings of ICCAS(International Conference on Computer Applications in Shipbuilding) 2007, Portsmouth, UK, pp. 283-290, 2007-09.18-20

  7. Jong-Hyeok Lee, Myung-Il Roh, Jin-Hyeok Kim, Sung-Jun Lee, Seung-Ho Ham, "Development of a Ship Navigation Simulator Based on Digital Twin Technology", Proceedings of ACDDE 2019, Penang, Malaysia, pp. 245, 2019.07.07-10

  8. John-Kyu Hwang, Myung-Il Roh, Ju-Hwan Cha, "Design Modification of a Damaged Free-Fall Lifeboat for FPSO through the Free-Fall Test", Proceedings of ISOPE(International Society of Offshore and Polar Engineers) 2014, Busan, Korea, 2014.06.15-20

  9. No Image 04Dec
    by SyDLab
    in International Conference

    John-Kyu Hwang, Myung-Il Roh, Ji-Hyun Hwang and Ju-Hwan Cha, Kyu-Yeul Lee, "Overview on Detailed Design and Construction of 2,000,000BBLS FPSO", Proceedings of Design & Construction of FPU(Floating Production Units) 2007, Suntec, Singapore, pp. 1-6, 2007.04.03

  10. John-Kyu Hwang, Geun-Jae Bang, Myung-Il Roh, Kyu-Yeul Lee, "Detailed Design and Construction of the Hull of an FPSO(Floating, Production, Storage, and Off-loading unit)", Proceedings of ISOPE 2009, Osaka, Japan, pp. 151-158, 2009.06.21-26

Board Pagination Prev 1 ... 5 6 7 8 9 10 11 12 13 14 Next
/ 14

Powered by Xpress Engine / Designed by Sketchbook

sketchbook5, 스케치북5

sketchbook5, 스케치북5

나눔글꼴 설치 안내


이 PC에는 나눔글꼴이 설치되어 있지 않습니다.

이 사이트를 나눔글꼴로 보기 위해서는
나눔글꼴을 설치해야 합니다.

설치 취소