Skip to content
Extra Form
Abstract The arrangement design of the ship mainly depends on the previous mothership data or the experience of experts because there are various restrictions of the owner and the classification regulations. Therefore, it is difficult to select the optimal design by examining various alternatives. Accordingly, a method that can review and optimize various arrangement designs before construction is required. Digital twin technology is one of the methods by which alternatives can be considered before production by creating digital replicas of real physical entities. This study propose a method for designing an optimal arrangement that satisfies the requirements of the ship-owner and several design rules and implements the result as a virtual twin. In the arrangement design process, locations of partitions dividing compartments and locations of each equipment are set as design variables. Furthermore, as objective functions, building cost, stability, and the feasibility for expert knowledge are considered. Also, the arrangement designed during the optimization process can be reviewed by the designer in advance as if the arrangement is actually manufactured through virtual twin. The effectiveness of the method proposed in this study is verified by applying it to selecting the optimal arrangement design for an actual ship. In particular, it has a differentiated advantage from the existing arrangement design optimization method in that the designer can visually review the design first.
Publication Date 2022-10-10

Jisang Ha, Myung-Il Roh, Ki-Su Kim, Min-Chul Kong, "Integrated Method for the Arrangement Design of a Ship for Implementing Digital Twin in Design", Proceedings of International Symposium on PRADS(Practical Design of Ships and Other Floating Structures) 2022, pp. 21, Dubrovnik, Croatia, 2022.10.09-13


List of Articles
번호 분류 제목 Publication Date
20 International Conference Kyu-Yeul Lee, Ju-Hwan Cha, Joon-Chae Lee, Myung-Il Roh, Ji-Hyun Hwang, "Determination of the Optimal Operating Condition of Dual Mixed Refrigerant Cycle at the Pre-FEED Stage of LNG FPSO Topside Liquefaction Process", Proceedings of ISOPE(International Society of Offshore and Polar Engineers) 2011, Maui, USA, pp. 151-158, 2011.06.19-24 file 2011-06-19
19 International Conference Yoon-Nam An, Joo-Sung Lee, Myung-Il Roh, Bum-Sang Yoon, Kyoung-Sik Chang, "Shape Optimization of Structural Member Based on Isogeometry Concept", Proceedings of the 24th Asian-Pacific TEAM(Technical Exchange and Advisory Meeting on Marine Structures) 2010, Vladivostok, Russia, pp. 343-348, 2010.08.23-26 file 2010-08-23
18 International Conference Yoon-Nam An, Joo-Sung Lee, Myung-Il Roh, Bum-Sang Yoon, Kyoung-Sik Chang, "Parametric Study of Mesh Refinement in Isogeometric Analysis", Proceedings of ISOPE(International Society of Offshore and Polar Engineers) 2010, Beijing, China, pp. 809-812, 2010.06.20-26 file 2010-06-20
17 International Conference Bo-Hyun Lee, Kyoung-Sik Chang, Bum-Sang Yoon, Joo-Sung Lee, Myung-Il Roh, "Large Eddy Simulation of Fully Turbulent Channel Flow Using Variational Multiscale Method", Proceedings of the 23rd Asian-Pacific TEAM(Technical Exchange and Advisory Meeting on Marine Structures) 2009, Kaohsiung, Taiwan, pp. 93-97, 2009.11.30-12.03 file 2009-11-30
16 International Conference Yoon-Nam An, Joo-Sung Lee, Myung-Il Roh, Bum-Sang Yoon, Kyoung-Sik Chang, "Parametric Study of Isogeometric Analysis Using NURBS", Proceedings of the 23rd Asian-Pacific TEAM(Technical Exchange and Advisory Meeting on Marine Structures) 2009, Kaohsiung, Taiwan, pp. 169-173, 2009.11.30-12.03 file 2009-11-30
15 International Conference Ju-Hwan Cha, Seung-Ho Ham, Kyu-Yeul Lee, Myung-Il Roh, Kwang-Pil Park, Heung-Won Suh, "Discrete Event/Discrete Time Simulation of Block Erection by a Floating Crane based on Multibody System Dynamics", Proceedings of ISOPE 2009, Osaka, Japan file 2009-06-21
14 International Conference Ji-Hyun Hwang, Ju-Hwan Cha, Seung-Ho Ham, Bo-Ram Kim, Myung-Il Roh, Kyu-Yeul Lee, "Establishment of Offshore Process FEED Method for Oil-Based FPSO Topsides Systems", Proceedings of ISOPE 2009, Osaka, Japan, pp. 144-150, 2009.06.21-26 file 2009-06-21
13 International Conference Ji-Hyun Hwang, Young-Joo Ahn, Joon-Ho Min, Gwang-No Lee, Ho-Jin Jeong, Mung-Yu Kim, Hee-Chang Kim, Myung-Il Roh, Kyu-Yeul Lee, "Application of an Integrated Basic Process Engineering Solution to Generic LNG FPSO Topsides", Proceedings of ISOPE 2009 file 2009-06-21
12 International Conference John-Kyu Hwang, Geun-Jae Bang, Myung-Il Roh, Kyu-Yeul Lee, "Detailed Design and Construction of the Hull of an FPSO(Floating, Production, Storage, and Off-loading unit)", Proceedings of ISOPE 2009, Osaka, Japan, pp. 151-158, 2009.06.21-26 file 2009-06-21
11 International Conference Ji-Hyun Hwang, Joon-Ho Min, Young-Joo Ahn, Hee-Chang Kim, Myung-Il Roh, Kyu-Yeul Lee, "Optimized Methodology to Build an Integrated Solution to Offshore Topside Process Engineering", Proceedings of ISOPE 2008, Vancouver, Canada, 2008.07.06-11 file 2008-07-06
Board Pagination Prev 1 ... 5 6 7 8 9 10 11 12 13 14 Next
/ 14

Powered by Xpress Engine / Designed by Sketchbook

sketchbook5, 스케치북5

sketchbook5, 스케치북5

나눔글꼴 설치 안내


이 PC에는 나눔글꼴이 설치되어 있지 않습니다.

이 사이트를 나눔글꼴로 보기 위해서는
나눔글꼴을 설치해야 합니다.

설치 취소