International Conference

Ji-Hyun Hwang, Young-Joo Ahn, Joon-Ho Min, Gwang-No Lee, Ho-Jin Jeong, Mung-Yu Kim, Hee-Chang Kim, Myung-Il Roh, Kyu-Yeul Lee, "Application of an Integrated Basic Process Engineering Solution to Generic LNG FPSO Topsides", Proceedings of ISOPE 2009

by SyDLab posted Dec 04, 2013
?

단축키

Prev이전 문서

Next다음 문서

ESC닫기

크게 작게 위로 아래로 댓글로 가기 인쇄
Extra Form
Abstract An Integrated FEED (Front End Engineering Design) process engineering solution proposed in our previous work is applied to the Pre-FEED process engineering phase of Generic LNG (Liquefied Natural Gas) FPSO (Floating, Production, Storage, and Offloading) topsides process systems. The concept of the selected generic LNG FPSO topsides Systems is introduced to build an integrated FEED process engineering solution. The proposed solution leads all process activities of the Pre-FEED engineering phase of generic LNG FPSO topsides systems to an automated and integrated processing. The results of the application show that the solution increases engineering efficiency considerably by reducing critical factors such as costs, length of time, and human error in the generic LNG FPSO project. Therefore, the integrated FEED process engineering solution can be useful in offshore topside engineering fields including LNG FPSO topsides FEED.
Publication Date 2009-06-21

Ji-Hyun Hwang, Young-Joo Ahn, Joon-Ho Min, Gwang-No Lee, Ho-Jin Jeong, Mung-Yu Kim, Hee-Chang Kim, Myung-Il Roh, Kyu-Yeul Lee, "Application of an Integrated Basic Process Engineering Solution to Generic LNG FPSO Topsides", Proceedings of ISOPE(International Society of Offshore and Polar Engineers) 2009, Osaka, Japan, pp. 136-143, 2009.06.21-26