Skip to content
Extra Form
Abstract An integrated simulation framework is proposed in this study. The proposed simulation framework provides an environment for developing various simulation systems for shipbuilding process planning. It consists of a simulation kernel, basic simulation component and application specific simulation component. The simulation kernel manages both DEVS and DTSS to deal with various simulation requests. The basic simulation component provides commonly used simulation models and modeling stratedgies, which are used to make a simulation system more efficient. The application specific simulation component implements the dynamics analysis, collision detection and realistic three dimensional visualization.
Publication Date 2007-09-18

Ju-Hwan Cha, Myung-Il Roh, Seung-Ho Ham, Kyu-Yeul Lee, Kwang Phil Park, Heung Won Suh, "Development of an Integrated Simulation Framework and Its Application to Shipbuilding Process Planning", Proceedings of ICCAS(International Conference on Computer Applications in Shipbuilding) 2007, Portsmouth, UK, pp. 283-290, 2007-09.18-20


  1. John-Kyu Hwang, Geun-Jae Bang, Myung-Il Roh, Kyu-Yeul Lee, "Detailed Design and Construction of the Hull of an FPSO(Floating, Production, Storage, and Off-loading unit)", Proceedings of ISOPE 2009, Osaka, Japan, pp. 151-158, 2009.06.21-26

  2. Ji-Hyun Hwang, Young-Joo Ahn, Joon-Ho Min, Gwang-No Lee, Ho-Jin Jeong, Mung-Yu Kim, Hee-Chang Kim, Myung-Il Roh, Kyu-Yeul Lee, "Application of an Integrated Basic Process Engineering Solution to Generic LNG FPSO Topsides", Proceedings of ISOPE 2009

  3. Ji-Hyun Hwang, Ju-Hwan Cha, Seung-Ho Ham, Bo-Ram Kim, Myung-Il Roh, Kyu-Yeul Lee, "Establishment of Offshore Process FEED Method for Oil-Based FPSO Topsides Systems", Proceedings of ISOPE 2009, Osaka, Japan, pp. 144-150, 2009.06.21-26

  4. Ju-Hwan Cha, Seung-Ho Ham, Kyu-Yeul Lee, Myung-Il Roh, Kwang-Pil Park, Heung-Won Suh, "Discrete Event/Discrete Time Simulation of Block Erection by a Floating Crane based on Multibody System Dynamics", Proceedings of ISOPE 2009, Osaka, Japan

  5. Ji-Hyun Hwang, Joon-Ho Min, Young-Joo Ahn, Hee-Chang Kim, Myung-Il Roh, Kyu-Yeul Lee, "Optimized Methodology to Build an Integrated Solution to Offshore Topside Process Engineering", Proceedings of ISOPE 2008, Vancouver, Canada, 2008.07.06-11

  6. No Image 04Dec
    by SyDLab
    in International Conference

    Ju-Hwan Cha, Myung-Il Roh, Seung-Ho Ham, Kyu-Yeul Lee, Kwang Phil Park, Heung Won Suh, "Development of an Integrated Simulation Framework and Its Application to Shipbuilding Process Planning", Proceedings of ICCAS(International Conference on Computer Applications in Shipbuilding) 2007, Portsmouth, UK, pp. 283-290, 2007-09.18-20

  7. Kyu-Yeul Lee, Myung-Il Roh, Ju-Hwan Cha, "Development of a Non-linear Optimization Program and Its Applications to Shipbuilding", Proceedings of the 1st Mongolia-Korea Joint Workshop on CAD/CAM, Ulaanbaatar, Mongolia, pp. 1-5, 2007.07.08-10

  8. John-Kyu Hwang, Myung-Il Roh, Ji-Hyun Hwang and Ju-Hwan Cha, Kyu-Yeul Lee, "Overview on Detailed Design and Construction of 2,000,000BBLS FPSO", Proceedings of Design & Construction of FPU(Floating Production Units) 2007, Suntec, Singapore, pp. 1-6, 2007.04.03

  9. Myung-Il Roh, Kyu-Yeul Lee, Seong-Jin Yoo, "An Algorithm for Generating the Hull Structural Analysis Model Using the Seam Information of the Hull Structure", Proceedings of the 2nd PAAMES and AMEC 2006, Jeju, Korea, pp. 399-404, 2006.10.17-20

  10. Myung-Il Roh, Kyu-Yeul Lee, "Generation of Production Information for a Building Block and Simulation of the Block Erection for Computer-Aided Process Planning and Scheduling", Proceedings of IMDC(International Marine Design Conference) 2006, Michigan, USA, pp. 382-395, 2006.05.16-19

Board Pagination Prev 1 ... 42 43 44 45 46 47 48 49 50 51 Next
/ 51

Powered by Xpress Engine / Designed by Sketchbook

sketchbook5, 스케치북5

sketchbook5, 스케치북5

나눔글꼴 설치 안내


이 PC에는 나눔글꼴이 설치되어 있지 않습니다.

이 사이트를 나눔글꼴로 보기 위해서는
나눔글꼴을 설치해야 합니다.

설치 취소