Domestic Journal

이수호, 안현식, 허윤, 배재류, 김기수, 함승호, 이성민, 노명일, "해양 공사 EPC 견적용 중량 추산 방법에 관한 기초 연구", 대한조선학회 논문집, Vol. 53, No. 2, pp. 154-161, 2016.04.01

by SyDLab posted Mar 10, 2016
?

단축키

Prev이전 문서

Next다음 문서

ESC닫기

크게 작게 위로 아래로 댓글로 가기 인쇄
Extra Form
Abstract There are several existing studies for the weight estimation of offshore plants. However, most of them were applicable at the pre-FEED (Front End Engineering Design) stage. In this paper, a preliminary study on a method for the weight estimation and calculation of offshore EPC (Engineering Procurement Construction) projects is made for the use at the estimation stage after FEED. Based on literature surveys including ISO (International Organization for Standardization) 19901-5 about weight estimation, we proposes new weight factors and a weight curve. Weight factors defined in this study include MTO (Material Take-Off), estimated weight, FEED maturity factor, allowance factor, and contingency factor. The proposed method utilizes bottom-up approach for weight estimation and it can be used for the weight estimation and calculation of offshore EPC projects at the estimation stage.
Publication Date 2016-04-01
Role Corresponding Author
Category KCI

이수호, 안현식, 허윤, 배재류, 김기수, 함승호, 이성민, 노명일, "해양 공사 EPC 견적용 중량 추산 방법에 관한 기초 연구", 대한조선학회 논문집, Vol. 53, No. 2, pp. 154-161, 2016.04.01