Hye-Won Lee, Myung-Il Roh, Seung-Ho Ham, "Block Turnover Simulation Considering the Interferences between the Block and Wire Ropes in Shipbuilding", Automation in Construction, Vol. 67, pp. 60-75, 2016.07.01
Hye-Won Lee, Myung-Il Roh, Seung-Ho Ham, "Block Turnover Simulation Considering the Interferences between the Block and Wire Ropes in Shipbuilding", Automation in Construction, Vol. 67, pp. 60-75, 2016.07.01
첨부 '1' |
---|
Abstract | Ship and offshore plants are constructed with cranes on the dock by joining several blocks, which are basic units for design and production in shipbuilding. In the joining process, the erection and turn‐over operation of a block can cause interference between the block and the wire ropes on the cranes. To identify such a possibility in advance, lifting simulation, which is a kind of dynamic simulation, can be used based on multibody system dynamics. At this time, it is necessary to calculate the contact forces exerted on the block because the block can be damaged or structurally deformed if the contact forces become larger than the allowable value. However, if the lifting simulation is performed with the traditional wire rope model modeled by an incompressible spring, it is difficult to check whether the block and the wire ropes interfere with each other, and to calculate the contact forces exerted, if any. To perform a realistic lifting simulation, a wire rope model that takes interference into consideration is adopted in this study. In addition, a contact algorithm that consists of four steps is proposed to check contacts and to calculate the contact forces. First, the Möller algorithm, which is generally known as the fastest algorithm for triangle-ray intersection, is applied to detect the contacts. Second, the contacted wire rope is divided to cope with the contacts. Third, the contact forces are calculated with the sum of the tensions in the wire rope segments including a contact point. To verify the efficiency and applicability of the proposed method, it is applied to block turnover simulation. It can be seen that the contacts can be accurately checked, and the corresponding contact forces can be calculated if there are contacts between the block and the wire ropes on the crane. |
---|---|
Publication Date | 2016-07-01 |
Role | Corresponding Author |
Category | SCIE |
Impact Factor | 2.442 |
-
Hye-Won Lee, Myung-Il Roh, Seung-Ho Ham, "Block Turnover Simulation Considering the Interferences between the Block and Wire Ropes in Shipbuilding", Automation in Construction, Vol. 67, pp. 60-75, 2016.07.01
-
Jeong-Woo Hong, Myung-Il Roh, Seung-Ho Ham, Sol Ha, "Dynamic Simulation of Subsea Equipment Installation Using an Offshore Support Vessel Based on Flexible Multibody System Dynamics", Journal of Marine Science and Technology (Taiwan), Vol. 24, No. 4
-
Sol Ha, Nam-Kug Ku, Myung-Il Roh, "Event-based Scenario Manager for Multibody Dynamics Simulation of Heavy Load Lifting Operations in Shipyards", International Journal of Naval Architecture and Ocean Engineering, Vol. 8, No. 1, pp. 83-101, 2016.01.01
-
Seung-Ho Ham, Myung-Il Roh, Hye-Won Lee, "Simulation of Load Lifting with Equalizers Used in Shipyards", Automation in Construction, Vol. 61, pp. 98-111, 2016.02.01
-
Seung-Ho Ham, Myung-Il Roh, Hye-Won Lee, Sol Ha, "Multibody Dynamic Analysis of a Heavy Load Suspended by a Floating Crane with Constraint-based Wire Rope", Ocean Engineering, Vol. 109, pp. 145-160, 2015.11.15
-
Dong-Hoon Jeong, Myung-Il Roh, Seung-Ho Ham, "Lifting Off Simulation of an Offshore Supply Vessel Considering Ocean Environmental Loads and Lifting Off Velocity", Ocean Systems Engineering, Vol. 5, No. 3, pp. 181-198, 2015.09.01
-
Sol Ha, Tae-Sub Um, Myung-Il Roh, Hyun-Kyoung Shin, “A Structural Weight Estimation Model of FPSO Topsides Using an Improved Genetic Programming Method”, Ships and Offshore Structures, Vol. 12, No. 1, pp. 43-55, 2017.01.01
-
Luman Zhao, Myung-Il Roh, “A Thrust Allocation Method for Efficient Dynamic Positioning of a Semisubmersible Drilling Rig Based on the Hybrid Optimization Algorithm”, Mathematical Problems in Engineering, Vol. 2015, pp. 1-12, 2015.10.01
-
Hye-Won Lee, Myung-Il Roh, Seung-Ho Ham, Sol Ha, "Dynamic Simulation of the Wireline Riser Tensioner System for a Mobile Offshore Drilling Unit Based on Multibody System Dynamics", Ocean Engineering, Vol. 106, pp. 485-495, 2015.09.15
-
Ki-Su Kim, Myung-Il Roh, Sol Ha, "Expert System Based on the Arrangement Evaluation Model for the Arrangement Design of a Submarine", Expert Systems with Applications, Vol. 42, No. 22, pp. 8731-8744, 2015.12.01
-
Luman Zhao, Myung-Il Roh, Jeong-Woo Hong, "Optimal Thrust Allocation for Dynamic Positioning of Deep-sea Working Vessel", Journal of Advanced Research in Ocean Engineering, Vol. 1, No. 2, pp. 94-105, 2015.06.01
-
Sol Ha, Seong-Ho Seo, Myung-Il Roh, Hyun-Kyoung Shin, "Simplified Nonlinear Model for the Weight Estimation of FPSO Plant Topside Using the Statistical Method", Ships and Offshore Structures, Vol. 11, No. 6, pp. 603-619, 2016.09.01
-
Sol Ha, Nam-Kug Ku, Myung-Il Roh, Ho-Jin Hwang, "Multibody System Dynamics Simulator for Process Simulation of Ships and Offshore Plants in Shipyards", Advances In Engineering Software, Vol. 85, pp. 12-25, 2015.07.01
-
Nam-Kug Ku, Ara Jo, Sol Ha, Myung-Il Roh, Kyu-Yeul Lee, "Automatic Generation of Equations of Motion for Multibody System in Discrete Event Simulation Framework", Procedia Technology, Vol. 1, No. 1, pp. 55-64, 2012.02.01
-
Nam-Kug Ku, Sol Ha, Myung-Il Roh, "Crane Modeling and Simulation in Offshore Structure Building Industry", International Journal of Computer Theory and Engineering, Vol. 6, No. 3, pp. 278-284, 2014.06.01
-
Tae-Sub Um, Myung-Il Roh, "Optimal Dimension Design of a Hatch Cover for Lightening a Bulk Carrier", International Journal of Naval Architecture and Ocean Engineering, Vol. 7, No. 2, pp. 270-287, 2015.03.01
-
Nam-Kug Ku, Sol Ha, Myung-Il Roh, "Design of Controller for Mobile Robot in Welding Process of Shipbuilding Engineering", Journal of Computational Design and Engineering, Vol. 1, No. 4, pp. 243-255, 2014.10.01
-
Nam-Kug Ku, Myung-Il Roh, "Dynamic Response Simulation of an Offshore Wind Turbine Suspended by a Floating Crane", Ships and Offshore Structures, Vol. 10, No. 6, pp. 621-634, 2015.11.01
-
Nam-Kug Ku, Ji-Hyun Hwang, Joon-Chae Lee, Myung-Il Roh, Kyu-Yeul Lee, "Optimal Module Layout for a Generic Offshore LNG Liquefaction Process of LNG-FPSO", Ships and Offshore Structures, Vol. 9, No. 3, pp. 311-332, 2014.05.01
-
Myung-Il Roh, Kyu-Yeul Lee, "Optimal Scheduling of Block Lifting in Consideration of the Minimization of Traveling Distance While Unloaded and Wire and Shackle Replacement of a Gantry Crane", Journal of Marine Science and Technology, Vol. 15, No. 2, pp. 190-200, 2010.06.01