Hye-Won Lee, Myung-Il Roh, Seung-Ho Ham, "Block Turnover Simulation Considering the Interferences between the Block and Wire Ropes in Shipbuilding", Automation in Construction, Vol. 67, pp. 60-75, 2016.07.01
Hye-Won Lee, Myung-Il Roh, Seung-Ho Ham, "Block Turnover Simulation Considering the Interferences between the Block and Wire Ropes in Shipbuilding", Automation in Construction, Vol. 67, pp. 60-75, 2016.07.01
첨부 '1' |
---|
Abstract | Ship and offshore plants are constructed with cranes on the dock by joining several blocks, which are basic units for design and production in shipbuilding. In the joining process, the erection and turn‐over operation of a block can cause interference between the block and the wire ropes on the cranes. To identify such a possibility in advance, lifting simulation, which is a kind of dynamic simulation, can be used based on multibody system dynamics. At this time, it is necessary to calculate the contact forces exerted on the block because the block can be damaged or structurally deformed if the contact forces become larger than the allowable value. However, if the lifting simulation is performed with the traditional wire rope model modeled by an incompressible spring, it is difficult to check whether the block and the wire ropes interfere with each other, and to calculate the contact forces exerted, if any. To perform a realistic lifting simulation, a wire rope model that takes interference into consideration is adopted in this study. In addition, a contact algorithm that consists of four steps is proposed to check contacts and to calculate the contact forces. First, the Möller algorithm, which is generally known as the fastest algorithm for triangle-ray intersection, is applied to detect the contacts. Second, the contacted wire rope is divided to cope with the contacts. Third, the contact forces are calculated with the sum of the tensions in the wire rope segments including a contact point. To verify the efficiency and applicability of the proposed method, it is applied to block turnover simulation. It can be seen that the contacts can be accurately checked, and the corresponding contact forces can be calculated if there are contacts between the block and the wire ropes on the crane. |
---|---|
Publication Date | 2016-07-01 |
Role | Corresponding Author |
Category | SCIE |
Impact Factor | 2.442 |
-
Hye-Won Lee, Myung-Il Roh, Seung-Ho Ham, Sol Ha, "Dynamic Simulation of the Wireline Riser Tensioner System for a Mobile Offshore Drilling Unit Based on Multibody System Dynamics", Ocean Engineering, Vol. 106, pp. 485-495, 2015.09.15
-
Luman Zhao, Myung-Il Roh, “A Thrust Allocation Method for Efficient Dynamic Positioning of a Semisubmersible Drilling Rig Based on the Hybrid Optimization Algorithm”, Mathematical Problems in Engineering, Vol. 2015, pp. 1-12, 2015.10.01
-
Nam-Kug Ku, Myung-Il Roh, "Dynamic Response Simulation of an Offshore Wind Turbine Suspended by a Floating Crane", Ships and Offshore Structures, Vol. 10, No. 6, pp. 621-634, 2015.11.01
-
Seung-Ho Ham, Myung-Il Roh, Hye-Won Lee, Sol Ha, "Multibody Dynamic Analysis of a Heavy Load Suspended by a Floating Crane with Constraint-based Wire Rope", Ocean Engineering, Vol. 109, pp. 145-160, 2015.11.15
-
Ki-Su Kim, Myung-Il Roh, Sol Ha, "Expert System Based on the Arrangement Evaluation Model for the Arrangement Design of a Submarine", Expert Systems with Applications, Vol. 42, No. 22, pp. 8731-8744, 2015.12.01
-
Sol Ha, Nam-Kug Ku, Myung-Il Roh, "Event-based Scenario Manager for Multibody Dynamics Simulation of Heavy Load Lifting Operations in Shipyards", International Journal of Naval Architecture and Ocean Engineering, Vol. 8, No. 1, pp. 83-101, 2016.01.01
-
Seung-Ho Ham, Myung-Il Roh, Hye-Won Lee, "Simulation of Load Lifting with Equalizers Used in Shipyards", Automation in Construction, Vol. 61, pp. 98-111, 2016.02.01
-
Dong-Hoon Jeong, Myung-Il Roh, Seung-Ho Ham, "Lifting Simulation of an Offshore Supply Vessel Considering Various Operating Conditions", Advances in Mechanical Engineering, Vol. 8, No. 6, pp. 1-13, 2016.06.16
-
Hye-Won Lee, Myung-Il Roh, Seung-Ho Ham, "Block Turnover Simulation Considering the Interferences between the Block and Wire Ropes in Shipbuilding", Automation in Construction, Vol. 67, pp. 60-75, 2016.07.01
-
Jeong-Woo Hong, Myung-Il Roh, Seung-Ho Ham, Sol Ha, "Dynamic Simulation of Subsea Equipment Installation Using an Offshore Support Vessel Based on Flexible Multibody System Dynamics", Journal of Marine Science and Technology (Taiwan), Vol. 24, No. 4
-
Ki-Su Kim, Myung-Il Roh, "A Submarine Arrangement Design Program Based on the Expert System and the Multistage Optimization", Advances In Engineering Software, Vol. 98, No. 97-111, 2016.08.01
-
Sol Ha, Seong-Ho Seo, Myung-Il Roh, Hyun-Kyoung Shin, "Simplified Nonlinear Model for the Weight Estimation of FPSO Plant Topside Using the Statistical Method", Ships and Offshore Structures, Vol. 11, No. 6, pp. 603-619, 2016.09.01
-
John-Kyu Hwang, Myung-Il Roh, Ju-Hwan Cha, “Design Modification of a Damaged Free-Fall Lifeboat for FPSO Through Free-Fall Tests”, International Journal of Offshore and Polar Engineering, Vol. 26, No. 4, pp. 417-422, 2016.12.01
-
Ju-Sung Kim, Myung-Il Roh, Seung-Ho Ham, “A Method for Intermediate Flooding and Sinking Simulation of a Damaged Floater in Time Domain”, Journal of Computational Design and Engineering, Vol. 4, No. 1, pp. 1-13, 2017.01.01
-
Sol Ha, Tae-Sub Um, Myung-Il Roh, Hyun-Kyoung Shin, “A Structural Weight Estimation Model of FPSO Topsides Using an Improved Genetic Programming Method”, Ships and Offshore Structures, Vol. 12, No. 1, pp. 43-55, 2017.01.01
-
Sung-Kyoon Kim, Myung-Il Roh, Ki-Su Kim, “Evaluation of Feasibility Index in the Arrangement Design of an Offshore Topside based on the Automatic Transformation of Experts’ Knowledge and the Fuzzy Logic”, Ocean Engineering, Vol. 130, 2017.01.15
-
Seong-Hoon Kim, Myung-Il Roh, Ki-Su Kim, Min-Jae Oh, “Big Data Platform Based on Hadoop and Application to Weight Estimation of FPSO Topside”, Journal of Advanced Research in Ocean Engineering, Vol. 3, No. 1, pp. 32-40, 2017.03.01
-
Sung-Kyoon Kim, Myung-Il Roh, Ki-Su Kim, “Arrangement Method of Offshore Topside Based on an Expert System and Optimization Technique”, Journal of Offshore Mechanics and Arctic Engineering, Vol. 139, No. 2, pp. 1-19, 2017.04.01
-
Dong-Hoon Jeong, Myung-Il Roh, Seung-Ho Ham, Chan-Young Lee, “Performance Analyses of Naval Ships Based on Engineering Level of Simulation at the Initial Design Stage”, IJNAOE, Vol. 9, No. 4, pp. 446-459, 2017.07.01
-
Dong-Hoon Jeong, Myung-Il Roh, Seung-Ho Ham, “Case Study of Detection and Maneuvering Performance of Naval Ships Using Engagement Simulation of Engineering Level”, Ocean Systems Engineering, Vol. 7, No. 3, pp. 247-273, 2017.09.01