이성, 함승호, 조로만, 하솔, 노명일, "조선소 생산 작업 지원을 위한 VR 기반 협업 시뮬레이션에 관한 연구", 2015년도 한국CAD/CAM학회 동계학술발표회, 평창, pp. 282-286, 2015.02.04-06
Domestic Conference
2015.02.16 19:04
이성, 함승호, 조로만, 하솔, 노명일, "조선소 생산 작업 지원을 위한 VR 기반 협업 시뮬레이션에 관한 연구", 2015년도 한국CAD/CAM학회 동계학술발표회, 평창, pp. 282-286, 2015.02.04-06
조회 수 2707
Abstract | In shipbuilding production, several types of cranes are simultaneously used to effectively handle a building block which is more than hundred tons. For this, one or more operators operate each crane, and the cooperation among the operators is very important. In the previous studies, the maximum tension of wire ropes of the cranes and motion of the block were analyzed computationally during lifting operation based on fixed scenarios with simulation. This couldn’t reflect the interaction during the operation which can cause unexpected results. Therefore, a collaborative simulation system for production in shipyard was developed in this study. The developed system is comprised of three parts. The first part is an input device which generates signals such as hoisting up and down of the wire ropes of the cranes. The second part is a dynamics engine which receives the signals from several operators and reflects them as a simulation scenario. The last part is a display device which is used to share simulation results between the workers and visualizes the simulation results in multi-views on the network. Finally, the developed system was applied to a block erection process which is operated by three crane operators and one commander. As a result, it is shown that the developed system can be used to simulate or train the collaborative work of the operators in shipyard. |
---|---|
Publication Date | 2015-02-05 |
Prev 김성균, 김기수, 홍정우, 하솔, 노명일, "해양 플랜트 상부의 통...
김성균, 김기수, 홍정우, 하솔, 노명일, "해양 플랜트 상부의 통...
2015.02.16by
김성균, 김기수, 홍정우, 하솔, 노명일, "해양 플랜트 상부의 통합 배치 최적화 방법에 관한 연구", 2015년도 한국CAD/CAM학회 동계학술발표회, 평창, pp. 287-291, 2015.02.04-06 Next
김성균, 김기수, 홍정우, 하솔, 노명일, "해양 플랜트 상부의 통합 배치 최적화 방법에 관한 연구", 2015년도 한국CAD/CAM학회 동계학술발표회, 평창, pp. 287-291, 2015.02.04-06
2015.02.16by SyDLab