바로가기 메뉴
본문 바로가기
푸터 바로가기
TOP

Myung-Il Roh, Kyu-Yeul Lee, “Generation of Production Information for a Building Block and Simulation of the Block Erection for Computer-Aided Process Planning and Scheduling”, Proceedings of IMDC (International Marine Design Conference) 2006, Michigan, USA, pp. 382-395, 2006.05.16-19

Myung-Il Roh, Kyu-Yeul Lee, “Generation of Production Information for a Building Block and Simulation of the Block Erection for Computer-Aided Process Planning and Scheduling”, Proceedings of IMDC (International Marine Design Conference) 2006, Michigan, USA, pp. 382-395, 2006.05.16-19
Presentation Date2006-05-16
Abstract
In the past, the process of generating the production material information of a building block and the simulation process of the block erection at the initial design stage has been performed manually using 2D drawings, data of parent ships, etc. To make these processes automatic, efficient methods for each process using a 3D CAD model were developed in this study.