Sung-Kyoon Kim, Myung-Il Roh, Ki-Su Kim, “Arrangement Method of Offshore Topside Based on an Expert System and Optimization Technique”, Journal of Offshore Mechanics and Arctic Engineering, Vol. 139, No. 2, pp. 1-19, 2017.04.01

Sung-Kyoon Kim, Myung-Il Roh, Ki-Su Kim, “Arrangement Method of Offshore Topside Based on an Expert System and Optimization Technique”, Journal of Offshore Mechanics and Arctic Engineering, Vol. 139, No. 2, pp. 1-19, 2017.04.01
Publication Date2017-04-01
RoleCorresponding Author
CategorySCIE
Impact Factor1.8
Abstract
An offshore platform has several modules that contain much of the equipment needed for oil and gas production, and these are placed on the limited space of the topside. Furthermore, the equipment layout should leave sufficient space in between to ensure operability, maintainability, and safety. Thus, the design problem to arrange the topside of an offshore platform can be difficult to solve due to the number of modules and equipment placed on the topside. This study proposes a method to arrange the offshore topside based on an expert system and multistage optimization in order to obtain the optimal arrangement that addresses various considerations and satisfies the given requirements. The proposed method consists of four components. First, an expert system is proposed to systematically computerize experts’ knowledge and experience and to evaluate the feasibility of alternatives for the arrangement of the offshore topside. Second, a multistage optimization method is proposed to yield a better arrangement design by formulating the arrangement design problem as an optimization problem with two stages. Third, an
Journal of Offshore Mechanics and Arctic Engineering