Abstract
An optimum layout method for offshore plant topside, especially FPSO, which consists of two steps is proposed in this study. The first step is module layout of topside, and the second step is equipment layout in each module. After the formulation of an optimization problem for each step, the proposed method is applied to an example of FPSO.
